Drywall Framing

Drywall framing is a specialized construction method, and we always use it to put together a wall for putting in drywall, or gypsum board. All framing on which these boards, or sheets, will be mounted must comply with precise dimensions because drywall sheets are manufactured to a regularly occurring size. Otherwise, drywall framing will all want to be customized reduce to match wall and ceiling studs, at an extra value in labor and material. In order to obtain framing at the most practical price of cloth and labor, we always use the facts below.

Vertical Wall Studs

According to traditional standards, install wall studs: 16" from stud core to stud center. We install plates for wall pinnacle and bottom, door and window double posts additionally, as usually performed for customary construction. As usual, installation the first stud center 16" from the bottom plate's outdoor edge.

Framing Corners

We should be sure that each vertical nook consists of two vertical framing individuals with the second 2" x 4" resting on the bottom plate, as all body studs do. And we also should avoid putting in studs with the flat aspect dealing with forward.

Closets

We should take critical steps to make certain that closets are properly framed, keeping in thinking the more vertical studs that are needed.

Bathtubs and Showers

Where we always use water-resistant drywall round tubs and showers, add greater 2"x 4" studs the place seams are created horizontally between drywall sheets. We should carry out blocking of this kind at precisely 4' above the top of the bath level, where the blockading center should be placed. 

24" Stud Blocking

For vertical studs spaced at 24 inches, as an alternative than the popular 16", add horizontal blocking off to provide a tightly closed surface into which we can sink our drywall screws. Measure down from the pinnacle 4' and ¼" and snap a horizontal line at this level. 

First Drywall Sheets Attached

We should do the ceiling sheets first to commence attaching your drywall sheets. All of our vertical sheets will be butted up towards the ceiling sheets by doing this, whose edges will greater probable be greater even taping of room corners.

Related News
  • Z Section Purlins

    Z Section Purlins

    August 14, 2018Through bloodless roll forming pre-hot dipped galvanized steel S450 which has a guaranteed minimum yield energy of 450N/mm2 and a Z275 galvanized coating, Rishbin Z section purlin is manufactured in l...view
  • The Development Of C Purlin Roll Forming Machine

    The Development Of C Purlin Roll Forming Machine

    January 23, 2018The important part of C purlin roll forming machine is the mill equipment, the transmission power of the mill equipment, and the control of all mold transmission. C purlin roll forming machine observe...view
  • Welded VS. Seamless

    Welded VS. Seamless

    August 14, 2018Do you choose a welded steel pipe, a welded carbon pipe? Or do you choose one of their seamless counterparts? Here are some advantages of welded steel pipe and seamless steel pipe to help you make you...view
  • The Development Trend Of Cut To Length Machine

    The Development Trend Of Cut To Length Machine

    January 23, 2018The cut to length machine is used for cutting rolled pieces in horizontal movement, which began in the late 19th century, after a hundred years of development, and more often used in the production pr...view
  • Lip Channel Steel

    Lip Channel Steel

    August 17, 2018The lip channel steel is a long strip of steel with a groove shape cross section. The lip channel steel is a structural carbon steel for construction and machinery. It is a section steel with a comple...view
  • Tube Mill Machine

    Tube Mill Machine

    August 14, 2018Tube mill machines for Stainless steel tubes:We constantly use stainless steel tubes for many applications, such as auto parts, piping, decoration, and others. And we composed the tube mills considering t...view
  • TEL:+86-18626315075
  • EMAIL:info@rishbin.com
  • ADDRESS:No. 10, Jingshi Rd, Wuxi, China
top